Posts

Backdating the Oxford Rail Dean Goods (2)

The Bumblebee Mk2 - a new traverser for Farthing

When in danger or in doubt... Progress on the fourth bite

GWR Stables (2): Internet archaeology

Scratchbuilt GWR horsedrawn float

The four phases of modeller's recovery

Zen and the joys of railway modelling

Secrets of the Drawing Office (2)

Secrets of the Drawing Office (1)

Fourth bite: The Stables

Modifying, painting and storing figures

The Finkerbury Files: Secrets of the footplate

Downsizing

GWR large flat dray

Ratkin & Son horse-drawn wagon

Kit-bashed GWR light dray

Porters and Barrows

Lamps and Lamplighters

Buffer stops, point levers, fishplates, loading gauge, wall

Same but different - early 1900s GWR wagons

Pre-grouping livery clippings

GWR Park Royal stable block

Backdating the Oxford Rail Dean Goods (1)

GWR 4 plank Open with DC1 brakes